Skip to main content

CCS – Auditor | Tax Agent | Business Advisor

e-Invoice Treatment for Construction Progress Claims

Share the Post:

HASiL’s construction industry FAQ explains that the timing of an e-Invoice for a construction progress claim depends on whether certification of the work done is required.

If certification is not required, the contractor must issue an e-Invoice in relation to the progress claim to substantiate the income generated.

If certification is required, the contractor may issue the e-Invoice upon obtaining the certificate of work done.

Contractors should therefore consider the certification requirements in their construction contracts when determining when to issue an e-Invoice for a progress claim.

建筑工程进度索款的电子发票处理

HASiL 建筑业常见问题解答说明,建筑工程进度索款的电子发票开具时点,取决于是否需要对已完成的工程进行认证。

若无需认证,承包商须就该进度索款开具电子发票,以证明所产生的收入。

若需要认证,承包商可在取得工程完成证明后开具电子发票。

因此,承包商应留意建筑合同中的认证要求,并据此确定进度索款电子发票的开具时点。